Project Outline:
The Project involved the site work, excavation and concrete footings, walls and suspended slabs for an 18,000 square foot residence.
The work included:
- Walls up to 400 mm by 6m high.
- 350 mm suspended slabs as well as slab on grade.
- Total volume of concrete 1,700 m3
- The Project has a short schedule requiring up to four, six-man crews working six days/week.
| Tender Value: |
|
$1,607,300.00 |
| Project Date: |
|
August 2001 |
| Key Personnel: |
|
Ted Chant |
| Owner: |
|
JEB Holdings Inc |
| Reference: |
|
John Bahen (905) 713-9998 |
| Consultant: |
|
McCasey Corp |
| Reference: |
|
Kent Taylor (905) 726-1911 |
|
|