G8 Isolated Phase Bus Replacement |
|
|
Project Outline:
Replacing the 48 existing rotor poles in Unit 8 hydro-electric generator (320 MW).
Work scope includes:
Working as the Owner’s representative,
- Providing Quality Assurance (QA) engineering consultant service,
- Participating in daily contractor tailboard meeting, and generating daily and weekly report,
- Harmonizing the construction service between the contractor and the project owner, and
- Witnessing and verification of the measurement and test programs in the site.
| Tender Value: |
|
$12,000,000.00 |
| Project Dates: |
|
June 2009 - March 2010 |
| Key Personnel: |
|
Ivan Huang Richard McGivern |
| Owner: |
|
BC Hydro |
| Reference: |
|
Bob Walker Construction Manager (250) 783-5064 |
|
|