Project Outline
Complete civil works for the installation of a Static Var Compensator at an existing Hydro One Transmission Station in Kirkland Lake Ontario.
The scope of work includes:
- concrete foundation for two transformer pads
- 40 electrical structure foundations
- glycol cooler foundation
- a control building
- all grounding, cable trenching, grading and site drainage
| Project Value: |
$ 4,700,000 |
| Key Personnel: |
Alan Avery Ian Dawyd Scott Morrison Wayne Olmstead Andy Valentine |
| Duration Date: |
November 2009 - September 2010 |
| Owner: |
ABB |
| Contact: |
Miguel C. Bertolucci (514) 856-6273 |
|
|