Project Outline:

Work scope included:

  • Developing means and methodology for decommissioning of powerhouse with specific attention taken to: - sealing of the structure below grade at the penstock entry
                                - demolition of the powerhouse super structure to genertor floor level
                                - demolition of office building
                                - dismantling and demolition of steel penstock and all electrical and  
                                   mechanical components
  • Compilation of Level 4 estimate per AACE completed using HCSS for the selected methodology
 
Duration :
  December 2009- March 2010
Key
Personnel:
  Ted Chant
Rafael Sanchez
Owner:   BC Hydro
Contact:   Tim Yzerman, P.Eng
Estimating and Scheduling
(604) 528-1563