Project Outline:
Work scope included:
- Developing means and methodology for decommissioning of powerhouse with specific attention taken to: - sealing of the structure below grade at the penstock entry
- demolition of the powerhouse super structure to genertor floor level - demolition of office building - dismantling and demolition of steel penstock and all electrical and mechanical components
- Compilation of Level 4 estimate per AACE completed using HCSS for the selected methodology
|
|
|
Duration :
|
|
December 2009- March 2010 |
Key Personnel: |
|
Ted Chant Rafael Sanchez |
| Owner: |
|
BC Hydro |
| Contact: |
|
Tim Yzerman, P.Eng Estimating and Scheduling (604) 528-1563 |
|
|