Gull River Prefeasibility Study Print

Project Outline:

On behalf of the Gull River First Nation, Chant Construction Limited performed a prefeasibility level evaluation of the hydroelectric potential at Site 2AD37 located on the Gull River in Northwestern, Ontario.  Two potential hydro-electric development scenarios have been defined in the evaluation:

  • 2.7 MW facility (the Primary Option) representing the optimized development of the full hydroelectric potential of the site, and
  • 1 MW generating facility (the Ancillary Option) which will be operated as an “islanded” generating station serving only the Gull River First Nation Community.
Project
Value:
 
$102,500.00
Duration :
  2010 (4 months)
Key
Personnel:
  Tim Saville
Ishfaq Ahmed
Dale Gilbert
Stephanie Rivest
Owner:   Gull Bay First Nation
Reference:   Kevin McDonald
Gull Bay: (807) 982-0006
Thunder Bay: (807) 627-0984
Consultant:   Byron LeClair
(807) 229-8885