Gull River Prefeasibility Study |
|
|
Project Outline:
On behalf of the Gull River First Nation, Chant Construction Limited performed a prefeasibility level evaluation of the hydroelectric potential at Site 2AD37 located on the Gull River in Northwestern, Ontario. Two potential hydro-electric development scenarios have been defined in the evaluation:
- 2.7 MW facility (the Primary Option) representing the optimized development of the full hydroelectric potential of the site, and
- 1 MW generating facility (the Ancillary Option) which will be operated as an “islanded” generating station serving only the Gull River First Nation Community.
Project Value: |
|
$102,500.00 |
Duration :
|
|
2010 (4 months) |
Key Personnel: |
|
Tim Saville Ishfaq Ahmed Dale Gilbert Stephanie Rivest |
| Owner: |
|
Gull Bay First Nation |
| Reference: |
|
Kevin McDonald Gull Bay: (807) 982-0006 Thunder Bay: (807) 627-0984
|
| Consultant: |
|
Byron LeClair (807) 229-8885 |
|
|
Last Updated on Friday, 16 July 2010 15:27 |